Raptor 3 Engine Qualification

SPAX-0005
· end 2026-11-016d left
Open
ERPNext ↗Drive folder — none linkedChat space — none linked
7 of 10 cards · 4 stages

3

Working✓ 0/1Urgent08/10
ORP anomalous vibration root cause
Jun 8 → Aug 10💬 1SA

4

Pending ReviewUrgent06/26
SN-47 throttle-sweep matrix (40–110%)
May 18 → Jun 26💬 1D
Working07/20
Sea-level nozzle gimbal envelope test
Jun 1 → Jul 20S
OpenHigh30d late
Vacuum-optimised bell extension hot-fire
Aug 5 → Sep 25D

1

OpenUrgentin 7d
Raptor 3 flight-release certification memo
Sep 28 → Nov 1A

2

💬 chat06/26
Circulate the CFD first-pass result
💬 chat07/02
Add two accelerometers to the SN-48 instrumentation