Raptor 3 Engine Qualification
SPAX-0005· end 2026-11-0198d left
Open
Emails
Showing threads with Gmail label proj/raptor-3-engine-qualification across workspace mailboxes. Click a row → opens in Gmail.
- ORP vibration — CFD re-run scope + boundary data2026-06-19 17:55
Measured injector-face pressure boundary attached. First-pass result expected 2026-06-26.
13 msgs· 7 attach· spacex.demovia sam.torres@spacex.demoOpen in Gmail ↗ - McGregor stand allocation — July / August2026-06-12 09:20
SN-48 gets the Tripod stand from 2026-07-06. RVac campaign needs the altitude stand from August.
6 msgs· 1 attach· spacex.demovia drew.vasquez@spacex.demoOpen in Gmail ↗