· end 2026-08-3035d left
Open
Emails
Showing threads with Gmail label proj/dragon-crew-11-mission-prep across workspace mailboxes. Click a row → opens in Gmail.
- ECLSS full acceptance re-run — test readiness2026-06-19 14:10
Bed repack complete, throughput at 96%. Fan-curve retune scheduled for Monday.
17 msgs· 6 attach· spacex.demo, nasa.govvia casey.kim@spacex.demoOpen in Gmail ↗ - Crew-11 simulator block — proposed dates2026-06-15 10:00
Twelve sessions from 2026-07-06. Crew office needs to confirm the abort-case blocks.
9 msgs· 2 attach· spacex.demo, nasa.govvia riley.okonkwo@spacex.demoOpen in Gmail ↗