Falcon 9 Block 5 Series 22+ Reliability

SPAX-0002· US Space Force
· end 2026-12-31158d left
Open
ERPNext ↗Drive folder — none linkedChat space — none linked
9 of 11 cards · 4 stages

3

WorkingUrgentin 6d
Merlin turbopump bearing spall root cause
May 15 → Jul 31💬 1SQ
Pending Review35d late
Octaweb bolt torque audit across the fleet
May 5 → Jun 20Q

4

OverdueHigh45d late
Grid fin actuator thermal-soak requal
Apr 20 → Jun 10💬 1C
WorkingHighin 21d
COPV-3 extended-cycle qualification
Mar 10 → Aug 15D
Workingin 36d
Interstage carbon-fibre delamination survey
Jun 1 → Aug 30J

2

OpenHigh11/15
40-flight reuse certification dossier draft
Aug 1 → Nov 15Q
Open12/20
USSF certification board dry-run
Nov 20 → Dec 20A

2

💬 chat31d late
Push the borescope interval change to ops
💬 chatin 16d
Draft the SMC dossier cover letter