Showing threads with Gmail label proj/falcon-9-block-5-series-22-reliability across workspace mailboxes. Click a row → opens in Gmail.
- SN-4472 bearing metallurgy report — draft 22026-06-18 09:55
Lubrication film breakdown confirmed. No evidence of a material or heat-treat defect.
6 msgs· 4 attach· spacex.demovia sam.torres@spacex.demoOpen in Gmail ↗ - USSF certification dossier — revised delivery date2026-06-05 16:30
Confirming 2026-11-15 delivery, 60 days ahead of the board as requested.
5 msgs· 1 attach· spacex.demo, spaceforce.milvia quinn.nakamura@spacex.demoOpen in Gmail ↗