Demo mode · SpaceX fixture data · no live backend
2
← Projects

Falcon 9 Block 5 Series 22+ Reliability

SPAX-0002· US Space Force
· end 2026-12-31158d left
Open
ERPNext ↗Drive folder — none linkedChat space — none linked

Meetings

2 meetings logged

  • Falcon reliability review — bearing spall

    2026-06-16 · 00:00 · 4 attendees

    Decisions

    Do not ground the fleet. Add a borescope check at every flight-15 interval.

    Action items

    Sam: lubrication-film model update by 2026-07-10 Quinn: publish the revised borescope interval to ops

    Notes

    Metallurgy points at lubrication film breakdown during the extended chill-in, not a material defect. No other engine in the fleet shows the same borescope signature yet.

  • US Space Force quarterly programme review

    2026-06-02 · 00:00 · 3 attendees

    Decisions

    Dossier delivery pulled left to 2026-11-15.

    Action items

    Quinn: revised dossier schedule Casey: actuator requal recovery plan

    Notes

    SMC wants the certification dossier 60 days ahead of the board rather than 30. Grid fin actuator requal is the item they are watching most closely.