Mark
Team decision surface — standup intel, PO approvals, quote gates.
MARK SESSIONS · NEW
Ask Mark to do something → goal-oriented agent runs with full SPA context →
TOMORROW'S AGENDA
What to push on at the next standup →
STANDUP REVIEW
Confirm or correct extracted events →
INVENTORY RECEIPTS
Review receipt photos →
CONSUMPTION
Attribute consumed items →
IMAGE ENRICHMENT
Review AI-sourced item images →
OUTBOUND SHIPMENTS
Review parcel photos →
Standup intel
Confirm or correct events extracted from team standups.
- Heat shield tile bonding is blocked — RTV-560 adhesive lot 4471 failed pull-test at 82 psi against a 110 psi spec. 3 tiles in the S29 stringer zone need re-bonding before the next hot-fire.SPAX-00012026-06-19
- Decision needed by Monday: ship Raptor 3 SN-47 to McGregor with the current ORP vibration signature, or pull the preburner and swap the injector faceplate. Sam wants Alex to call it.SPAX-00052026-06-19
- Dragon Crew-11 ECLSS acceptance slipped from 2026-06-26 to 2026-07-08 — the CO₂ scrubber bed rework needs a second vacuum bake cycle. NASA milestone review not yet re-baselined.SPAX-00032026-06-19
- Starlink Gen 2 phased-array panel yield dropped to 71% on line 3 this week (was 89%). If it holds two more weeks the Q3 launch cadence loses roughly 40 satellites.SPAX-00042026-06-19
- Merlin 1D igniter cartridge qualification closed out — 40/40 hot starts, zero anomalies. Falcon 9 Block 5 series 22 cleared for the reliability dossier.SPAX-00022026-06-19
View all →open items
Inventory receipts
Photo receipts from the Inventory chat space — confirm or correct before writing to ERPNext.
- IR-2026-0053Taylor Singh2026-06-19 15:03:48
- IR-2026-0052Drew Vasquez2026-06-19 11:17:35
- IR-2026-0051Jordan Mercer2026-06-19 08:42:11
- IR-2026-0048Sam Torres2026-06-16 10:11:02
View all →open items
Consumption reconciliation
Scan-delta cards — attribute consumed qty to project(s).
- TPS-TILE-9X9-B2026-06-19 06:00:00
- TPS-ADH-RTV5602026-06-19 06:00:00
- GF-ACT-77102026-06-19 06:00:00
- OCTW-BOLT-M202026-06-18 06:00:00
- SL-ANT-FEED-42026-06-18 06:00:00
View all →open items
PO approvals
Supplier POs in Frappe Workflow (Unit 13). Approve/Reject in Desk.
- PO-SPAX-00010Bosch Rexroth AG · USD 620,000.002026-06-10 16:00:00
- PO-SPAX-00016Teledyne Technologies Inc. · USD 1,200,000.002026-06-12 13:00:00
View all →open items
Quote checkpoints
Quote build/assemble approval gates (A / A.5 / B).
- QC-1142Iridium Communications2026-06-17 16:45:00
- QC-1148European Space Agency2026-06-19 08:30:00
- QC-1149UAE Space Agency2026-06-19 11:55:00
- QC-1147Telesat2026-06-16 09:05:00
- QC-1146JAXA2026-06-18 14:10:00
View all →open items
Intel queue
Signals from meetings / email / chat awaiting review.
- NASA Crew-11 milestone sync — ECLSS acceptance slip acknowledgedSPAX-00032026-06-19 16:42:10
- SKF quality — lot 88-2291 traceability, 11 engines affectedSPAX-00022026-06-19 14:08:55
- Hexcel rep hinted at a 3-week prepreg lead time increase from Q4SPAX-00062026-06-19 11:27:33
- US Space Force program office asked about Falcon 9 reuse count ceilingSPAX-00022026-06-18 15:50:02
- OneWeb procurement flagged the rideshare dispenser acceptance paperwork gapSPAX-00072026-06-18 10:33:19
View all →open items
Intel learning
LLM classifier learning context (singleton-ish).
- classifier.schedule_risk2026-06-19 03:15:00
- classifier.supplier_quality2026-06-18 03:15:00
- classifier.customer_signal2026-06-17 03:15:00
- classifier.noise_filter2026-06-16 03:15:00
- standup.project_disambiguation2026-06-14 03:15:00
View all →recent rows