Friday, 19 June 2026
5 to review · 0 confirmed · 0 discarded
- Bottleneckneeds review
Evidence quote
“"We can't close out the aft dome until the adhesive lot is re-certified — the pull coupons came back at 82."”
- Decisionneeds review
Evidence quote
“"Either we accept the 3.2 Hz and instrument it heavily, or we pull the ORP — I need a call before Monday's transport window."”
- Delayedmatch: mediumneeds review
Evidence quote
“"Second bake is 96 hours, so realistically acceptance moves to the week of the eighth."”
- At riskmatch: mediumneeds review
Evidence quote
“"Line 3 yield is 71 percent — it's the feed-network solder reflow profile, we think."”
- Doneneeds review
Evidence quote
“"Forty for forty on the igniter — that campaign is done."”