Demo mode · SpaceX fixture data · no live backend
2
← Projects

Axiom Station Module Transport

SPAX-0009· Axiom Space
· end 2027-06-01310d left
Open
ERPNext ↗Drive folder — none linkedChat space — none linked

Meetings

1 meeting logged

  • Axiom module transport TIM #4

    2026-06-10 · 00:00 · 4 attendees

    Decisions

    Power budget re-opened — a delta of 1.4 kW has to be traded against the transit duration.

    Action items

    Casey: power budget trade by 2026-07-15 Jordan: confirm the cradle PDR date with Axiom

    Notes

    Axiom need 3.2 kW continuous during transit; our current payload-bay budget assumes 1.8 kW. Cradle PDR pencilled for September.