· end 2027-06-01310d left
Open
Meetings
1 meeting logged
Axiom module transport TIM #4
2026-06-10 · 00:00 · 4 attendees
DecisionsPower budget re-opened — a delta of 1.4 kW has to be traded against the transit duration.
Action itemsCasey: power budget trade by 2026-07-15 Jordan: confirm the cradle PDR date with Axiom
NotesAxiom need 3.2 kW continuous during transit; our current payload-bay budget assumes 1.8 kW. Cradle PDR pencilled for September.