Heat Shield Tile System V2
SPAX-0006· end 2026-10-1581d left
Open
Mark intel
- Planned2026-06-18from: standup meeting
Avery will run the V2 tile arc-jet campaign the week of 2026-06-29 — 24 coupons, two ablation profiles. Needs the Materion coating lot released by 06-26.
who: Avery Chen
open transcript ↗ - Done2026-06-12from: standup meeting
Tile V2 mechanical attachment redesign released to manufacturing — pin-and-clip replaces the bonded stud on 62% of the windward field.
who: Alex Reeves
open transcript ↗
Payment milestones
No milestones set.