Edit in Desk ↗LOX fill line freeze event during tanking operation
Investigatingteam@spacex.demo · 2026-08-13 13:16:33 · ISS-SPAX-0005
Customer
NASA
Americas · owner: alex.reeves
Machine / asset
Raptor 3Raptor 3
serial R3-TS-0114 · MACH-0001
DisciplineMechanical
PriorityHigh
Spares statusReceived
Last updated2026-08-15 04:16
Description
Freeze detected at T-47min during LOX loading. Fill line condensation caused a plug that delayed the launch window by 3h.
Work log
Currently: In progress3 entries- DVdrew.vasquezIn progressAug 15 · 04:16 AM
Wet dress scheduled. Adding a purge-flow interlock to the tanking sequence as a permanent guard.
- DVdrew.vasquezIn progressAug 14 · 09:16 AM
Replacement regulator received and fitted. Re-certifying before the next wet dress.
- DVdrew.vasquezDiagnosedAug 13 · 05:16 PM
Purge flow on the outer jacket was below setpoint for the whole load. Regulator drifted.