← NASA
Edit in Desk ↗LOX fill line freeze event during tanking operation
Openteam@spacex.demo · 2026-05-28 · ISS-SPAX-0005
Asset—
PriorityHigh
Spares statusNone
Last updated2026-06-05 09:00
Description
Freeze detected at T-47min during LOX loading. Fill line condensation caused plug that delayed launch window by 3h.
Timeline
ccp.team@nasa.gov2026-05-30 08:50
Please provide the tanking timeline and the fill-line temperature trace for the 3-hour hold. We want it in the Crew-11 readiness package.
taylor.singh@spacex.demo2026-06-04 12:30
Trace attached. Root cause is condensation at the fill-line elbow; we are adding a purge line and revising the chill-down sequence.
Actions
Move to