LOX fill line freeze event during tanking operation

Investigating

team@spacex.demo · 2026-08-13 13:16:33 · ISS-SPAX-0005

Edit in Desk ↗
Customer
NASA
Americas · owner: alex.reeves
Machine / asset
Raptor 3Raptor 3
serial R3-TS-0114 · MACH-0001
DisciplineMechanical
PriorityHigh
Spares statusReceived
Last updated2026-08-15 04:16

Description

Freeze detected at T-47min during LOX loading. Fill line condensation caused a plug that delayed the launch window by 3h.

Work log

Currently: In progress3 entries
  1. DVdrew.vasquezIn progressAug 15 · 04:16 AM

    Wet dress scheduled. Adding a purge-flow interlock to the tanking sequence as a permanent guard.

  2. DVdrew.vasquezIn progressAug 14 · 09:16 AM

    Replacement regulator received and fitted. Re-certifying before the next wet dress.

  3. DVdrew.vasquezDiagnosedAug 13 · 05:16 PM

    Purge flow on the outer jacket was below setpoint for the whole load. Regulator drifted.