← NASA
Edit in Desk ↗Heat shield tile de-bond — S29 stringer attachment zone
Openteam@spacex.demo · 2026-06-10 · ISS-SPAX-0001
Asset—
PriorityHigh
Spares statusNone
Last updated2026-06-15 10:00
Description
Tile 247-B shows disbond from TPS adhesive layer during post-static-fire inspection.
Timeline
quinn.nakamura@spacex.demo2026-06-10 09:15
Post-static-fire walkdown found tile 247-B fully disbonded from the TPS adhesive layer at the S29 stringer attachment. Photos attached. Requesting a disposition before we continue the bonding sweep.
hls.team@nasa.gov2026-06-12 14:40
Is this the same adhesive lot that flew on IFT-6? We would like the lot traveller before the next HLS commonality discussion.
jordan.mercer@spacex.demo2026-06-15 10:05
Different lot. Rework plan is a 240-tile strip and re-bond using the V2 stack with the shortened cure. Burn-down starts today, close date 2026-07-04.
Actions
Move to